A dumpster has two separate limits stapled together in one rental: a cubic-yard box size, and a tonnage cap included in the price before overage fees kick in. Debris doesn't respect either one consistently — a tear-off of asphalt shingles can max out the tonnage on a 20-yard box while it's barely a third full, and a strip-out of carpet, drywall and framing lumber from a whole floor can fill the same size box to the brim while coming in well under its weight cap.

This calculator builds both totals from what you're actually tearing out — shingles, drywall, carpet, lumber, broken concrete, and general debris — using published weight and volume figures for each, then sizes the dumpster to whichever cap runs out first. It's the debris-out counterpart to the bulk delivery calculator, which runs the identical volume-against-weight comparison for material coming onto the site rather than off it.

Calculate your quantity

100 sq ft each

cubic yards of mixed material

Dumpster size

10 cu yd

Debris weight

0 tons

Total debris volume
0 cu yd
Shingles
0 cu yd
Drywall
0 cu yd
Carpet and pad
0 cu yd
Lumber
0 cu yd
Concrete
0 cu yd
Included tonnage
2 tons
Overage
0 tons
  • Volume decides this one: 0 cu yd against 0 tons. Light, bulky debris runs out of space first.

Shopping summary

  • One 10 cu yd dumpster (2 tons included)
  • No overage expected

This is an estimate — confirm structural work with a professional.

How this calculation works

Each debris type gets its own weight and volume figure per unit — per roofing square, per drywall sheet, per square foot of carpet, per linear foot of lumber, per cubic foot of broken concrete — and those figures differ by close to two orders of magnitude between the lightest and heaviest material this page handles. A roofing square of shingles runs about 250 lb; a cubic foot of concrete runs about 150 lb on its own, meaning even a modest slab breakout can add thousands of pounds from a footprint that looks small next to a room full of carpet and drywall.

The four standard container sizes — 10, 20, 30 and 40 cu yd — are each paired with an included tonnage that rises more slowly than the box size does, because a bigger box is assumed to hold bulkier, lighter debris on average. That assumption breaks down fast on a job that's mostly shingles or concrete, which is exactly why this page checks both caps independently and reports whichever one actually decides the size, rather than sizing on volume alone.

  • Multiple shingle layers multiply both the weight and volume figures directly — a two-layer tear-off is twice the debris of a one-layer tear-off on the same roof, not a modest adjustment.
  • Concrete's weight-to-volume ratio is far higher than every other material this page handles; a small amount of broken concrete can push a job into a bigger dumpster on tonnage alone while barely denting the volume total.
  • Overage is reported explicitly when the chosen size's included tonnage is exceeded — that's the number a hauler bills extra for, and it's worth knowing before the truck arrives rather than after.
  • General debris is a catch-all cubic-yard entry for anything that doesn't fit the other categories, weighted at a rough mixed-debris rate rather than a specific material figure.

The formula

chosen = (byVolume.size ≥ byWeight.size) ? byVolume : byWeight, where each is the smallest container whose cap covers the corresponding total

shingle weight and volume
250 lb and 0.33 cu yd per roofing square, per layer — multiplied directly by the number of layers being torn off, since each layer adds its own full weight and volume rather than a partial share.
concrete weight and volume
150 lb per cubic foot at the entered thickness, with the broken volume increased by a 1.4x bulking factor over the intact slab volume — broken concrete takes up more space in a container than the same concrete did as a solid slab.
totalTons / totalVolume
The sum of every debris category's weight and volume, converted to tons and cubic yards respectively — the two figures each container size is checked against independently.
byWeight / byVolume
The smallest standard container size whose included tonnage covers totalTons, and separately, whose cubic-yard size covers totalVolume — computed as two independent answers before either is chosen.
chosen container
The larger of byWeight and byVolume — whichever cap actually requires the bigger box governs the final size, and the page reports which one it was.
overage
totalTons minus the chosen container's included tonnage, floored at zero. A positive figure here is what a hauler typically bills as an extra per-ton overage charge on top of the base rental price.

Where these numbers come from

Asphalt shingles at 250 lb and 0.33 cu yd per square per layer
Commonly published tear-off debris figures used across dumpster-rental and roofing-disposal guidance. Actual weight varies with shingle type and moisture — a rain-soaked tear-off can run heavier than a dry one — so treat this as a planning figure rather than a scale-verified one.
Drywall at 51 lb per sheet, carpet and pad at 0.5 lb per sq ft
Commonly cited approximate weights for standard 1/2 in drywall sheets and residential carpet with pad, drawn from general waste-disposal and renovation planning references. Thicker drywall and denser carpet padding will run heavier than these figures.
Broken concrete at 150 lb per cubic foot, bulking 1.4x when broken
150 lb per cu ft is the commonly cited density for normal-weight concrete. The 1.4x bulking factor for broken concrete versus intact slab volume is a widely used rule of thumb in demolition estimating — actual bulking varies with how finely the concrete is broken up.
Standard container sizes at 10/20/30/40 cu yd with 2/3/4/5 tons included
Common dumpster-rental sizing and included-tonnage tiers used across the industry. Exact included tonnage and available sizes vary meaningfully by hauler and by region, so confirm the specific cap your rental quote lists before relying on this page's figures for a firm budget.

Worked examples

A single-layer 20-square roof tear-off, nothing else

Inputs
Roof squares to tear off20
Shingle layers1
Drywall sheets0
Carpet and pad0 sq ft
Lumber0 ft
Concrete to break out0 sq ft
Concrete thickness4 in
General debris0
Result
Dumpster size20 cu yd
Debris weight2.5 tons
Total debris volume6.6 cu yd
Shingles6.6 cu yd
Drywall0 cu yd
Carpet and pad0 cu yd
Lumber0 cu yd
Concrete0 cu yd
Included tonnage3 tons
Overage0 tons

2.5 tons of shingles from just 20 squares only fills 6.6 cu yd — a 10-yard box would have plenty of room left, but its 2-ton included limit is already 0.5 tons short of what this roof alone weighs. The 20-yard size isn't chosen for its space, which this job barely uses a third of; it's chosen because it's the smallest box whose 3-ton included weight actually covers the load.

This is the single clearest case of tonnage deciding a dumpster size on this site: a roof tear-off with no other debris, where the box could physically be much smaller if weight weren't the constraint. Ordering by eyeballing the pile — which would look like it needs a 10-yard box — would land the job with a hauler's overage bill instead.

A whole-house strip-out — drywall, carpet and lumber, no concrete

Inputs
Roof squares to tear off0
Shingle layers1
Drywall sheets60
Carpet and pad2000 sq ft
Lumber200 ft
Concrete to break out0 sq ft
Concrete thickness4 in
General debris1
Result
Dumpster size30 cu yd
Debris weight2.41 tons
Total debris volume21.2 cu yd
Shingles0 cu yd
Drywall3 cu yd
Carpet and pad16 cu yd
Lumber1.2 cu yd
Concrete0 cu yd
Included tonnage4 tons
Overage0 tons

This job weighs less than the roof tear-off above — 2.41 tons against 2.5 — but takes a 30-yard box against that job's 20-yard box, because it's over three times the volume at 21.2 cu yd. Carpet is most of that bulk: 2,000 sq ft of it adds 16 cu yd on its own while weighing only about 1,000 lb, the exact opposite ratio shingles and concrete produce.

Side by side, these two examples are the whole point of checking both caps rather than sizing by eye: the lighter job needs the bigger box, and the heavier-per-square-foot job needs the smaller one, because volume and weight run out at genuinely different rates depending on what's actually being thrown away.

Common mistakes

  • Sizing a dumpster by the volume of debris alone, without checking the included tonnage. This is exactly backwards on a roofing or concrete job, where weight caps out first while the box still has visible room left.
  • Forgetting that multiple shingle layers multiply the tear-off weight directly. A two-layer tear-off on the same roof this page's first example used would weigh close to 5 tons, likely pushing the size up two tiers rather than one.
  • Mixing broken concrete into a general debris dumpster instead of ordering a dedicated clean-fill or concrete box. Concrete's weight-to-volume ratio is so much higher than everything else on this page that it often makes more sense — and can cost less — as its own load.
  • Assuming a bigger container always has proportionally more included tonnage. It doesn't — the standard tiers add roughly one ton per size step while the volume steps up by ten cubic yards, so tonnage becomes the binding constraint faster than the box size alone would suggest.
  • Not accounting for wet or rain-soaked debris. A tear-off left uncovered overnight can weigh noticeably more than these dry-material figures assume, which matters most on jobs already close to a tonnage cap.

Shopping summary

What this page produces is a size and a weight estimate to quote against, not a purchase — call it in against a local hauler's actual size and tonnage tiers, since those vary by region and by company even though the general shape (bigger box, slowly rising tonnage cap) holds industry-wide.

On a job that's also bringing material in — fill dirt, gravel, new framing lumber — the bulk delivery calculator runs the same weight-against-volume logic from the other direction, for whatever's arriving rather than what's leaving.

FAQ

Why does the tonnage cap matter if I'm not being charged by weight?

Because almost every dumpster rental includes a tonnage cap even on a flat-rate quote, with an overage fee per ton beyond it — the flat rate isn't unlimited weight, it's a weight allowance bundled into the price. Checking the tonnage total against the included cap before the truck arrives is how you avoid a surprise line item on the final invoice.

Should concrete always go in its own dumpster?

It's usually worth pricing separately even if you don't end up doing it, because concrete's weight per cubic foot is so much higher than every other material this page tracks that a mixed load with concrete in it often needs a bigger box purely for the weight, when a dedicated clean-fill container sized for concrete alone would have been smaller and frequently cheaper.

How much heavier does wet debris actually get?

Enough to matter on a job already near its tonnage cap — shingles and drywall in particular can absorb meaningful water weight if left exposed. There's no way for this page to detect that, so treat the figures here as a dry-debris estimate and lean toward the next size up if the tear-off will sit uncovered before pickup.

What's the difference between this and just estimating cubic yards from the room sizes being cleared out?

A room-size estimate gives you volume, which is only half the sizing question. The strip-out example on this page weighs less than the small roof tear-off example while needing a bigger box — a volume-only estimate would have gotten the roof job wrong by undersizing it on weight, and the size comparison between the two jobs the other way around.

Does layering shingle count multiply the volume as well as the weight?

Yes — both figures are per square, per layer, so a two-layer tear-off doubles the shingle contribution to both the weight and volume totals, not just one of them. That's usually the single biggest input on this page for a roofing-only job, larger in effect than any other field.

Where to go next

The projects this number is a step of, the guides that explain the method behind it, and the rest of its trade group.